March was pretty nuts with work stuff and exams, but I still managed to get quite a lot done.
Finished projects
Both the Daffodil socks and Ms. Marigold are finished. Yay!
Projects in progress
I'm partway through the second Kaylee sock, and I've also started Hedera. After I got my swift, I wound the Shelridge Farms yarn into a cake, ready to cast on for Elfine's Socks.
Stash knit down progress
360 metres to finish Ms Marigold, 160 metres for Kaylee, 50 metres to finish off the Daffodil socks, 30 metres to start Hedera. 600 metres for March!
And I spent $21 on sock yarn, which means that I have fallen down on the yarn purchase ban two months in a row. Note the lack of guilt. :)
April goals
For April, I seem to have a bit of a sock thing going. It's funny that it's taken me this long to jump onto the bandwagon, but now that I have, I'm totally committed to having a drawer full of handknit socks. And after the success of Ms Marigold, I'm hooked on making more wardrobe pieces and have decided to cast on for Henley Perfected from the Winter 2007 IK.
This month's goals are:
1. Finish the second Kaylee sock.
2. Finish both Hedera socks.
3. Knit both sleeves for Henley Perfected.
4. Finish the first Elfine sock.
5. Start and finish a felted box.
6. Start and knit 2 skeins into a log cabin blanket for the cats.
Monday, March 31, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment