As evidenced by the textbook crowding into the shot, I should be studying. Alas, I have nearly given up on this course and anticipate having to repeat the exam in March. The irony is that the work I'm doing at the job is actually at a much more advanced level than my course. Ugh. I hate irony.
Monday, November 19, 2007
Procrastination, stress relief, whatever
As evidenced by the textbook crowding into the shot, I should be studying. Alas, I have nearly given up on this course and anticipate having to repeat the exam in March. The irony is that the work I'm doing at the job is actually at a much more advanced level than my course. Ugh. I hate irony.
Thursday, November 15, 2007
FO: wrist warmers!
Project: Wrist Warmers from Last Minute Knitted Gifts
Yarn: Debbie Bliss Cashmerino Aran, 1.5 balls
Needle: US 6 circulars
Notes: Cast on 28 stitches for a snug fit, and three patterns repeats instead of two.
Saturday, November 10, 2007
Untempted
I knit two inches on the yoke and definitely needed at least one more skein. Even though I found one on Ravelry in someone else's stash, in the end I just didn't love this sweater enough to keep moving on it.
I've learned enough over the past two years to see what didn't work about this particular pattern for me. Straight 2x2 ribbing is not particularly flattering to my square torso; I need something a little more patterned that adds the illusion of shape. I also look much better in a V-neck than any other style of neckline, and, in retrospect, an off-the-shoulder sweater was probably not the most practical of wardrobe items.
This is okay! This project has been sitting on the needles for nearly two years, and I'm glad it's over. I will happily use the yarn to make a pair of wrist warmers from Last Minute Knitted Gifts, a Quickie Cowl, and maybe a Foliage hat.
Oh, wagon, why have you left me behind?

I ordered a 32 inch KnitPicks circular, US size 2, and a couple of skeins of Gloss in burgundy, because hey, I've never ordered from them before. And I finished off a scarf this week, removing three skeins of Noro Kureyon from the stash, so I was still at a net loss. But then, this morning, I had to check out Knitopia, which moved recently from White Rock to Langley, and somehow I fell into a pile of sock yarn.
This is the same sock yarn used to make the popular Monkey socks on Knitty. So soft.
And then I picked up some of this new Jojoland Melody, a 100% superwash wool from China.
I see the stash busting wagon, wayyyyyy off in the distance...
Friday, November 09, 2007
WIP: Tempting
Wednesday, November 07, 2007
First Christmas gift of the season - done!
Tonight I had a rare couple of free hours, so I sat down and finished off the scarf for my brother's fiancee. And here's my first attempt at modelling:
Project: My So-Called Scarf
Yarn: Noro Kureyon, colourway 164, 3 balls
Needle: US 11 circular
I suppose I should airbrush that chin zit-in-waiting...
Monday, November 05, 2007
KAL: Clean slate for 2008!
Look! I have progress!
That's a whole three-inch sleeve and a one inch of the second sleeve, all since last night. I would have had them both done, except that I had to rip the first attempt, as the called-for number of stitches was way excessive for even my beefy bicep. This project might actually be done by the end of the week...(ack! jinx!)
Monday, January 01, 2007
2006 was...
I haven't posted since mid-November because I haven't finished any knit projects. In lieu of pictures, then, let's do a quick year-in-review!
So, 2006 was:
The year we bought a house.
Home ownership, man. Heavy. I love my new house. This was a major step in my life and in my partnership with CM, and we're still adjusting to the changes it's brought. Fun, though!
The year I got a new job.
I was bored and restless with my old job. Now I'm stressed and happy(ish) with my new job. I'm moving away from the career that's gotten me to this point, and moving into a new one that I find more interesting and challenging, although a vast majority of the world would not. That's what we calling filling a niche!
The year I forgot I was a writer.
It was a difficult twelve months on the writing front. I got an insignificant number of words on paper, and an even more insignificant amount of plot movement forward. 2006 was definitely not the year of the book, as I had been hoping.
I did do a lot of thinking this year about writing to audiences, and ultimately found the concept unattractive. What makes me tick is not the possibility that other people will read and enjoy my work; it's the hope that by writing this novel, I produce something beautiful that I can appreciate as a creation wholly my own.
Then I started thinking about babies. And slowly backed away...
Friday, November 17, 2006
Alive, and with a photo!
It's warm, and the Cashmerino Chunky feels very luxurious. Alas, I'm allergic to it. I'll keep it handy to wear over a long-sleeved shirt when it gets cold and we're skimping on heat in the house, but it's not something I can wear with a tight-fitting t-shirt or tank top.
Monday, November 06, 2006
Memeing to convince myself I'm still here
Bert You scored 70% Organization, 45% abstract, and 47% extroverted! |
This test measured 3 variables.
You are very organized, both concrete and abstract, and both introverted and extroverted. You are both very organized. You almost always know where your belongings are and you prefer things neat. You may even enjoy cleaning and find it therapeutic. Bert is a big neat freak and gets quite annoyed when Ernie makes a big mess.
|
Tuesday, October 24, 2006
Can I be allergic to silk?
Gah. I think I'm going to be making a major investment in long-sleeved thin cotton shirts fairly soon. Anyone up for a trip to American Eagle?
Monday, October 23, 2006
I went to Mexico, and all I got was this lousy picture of cows
Heh. Well, there's also a picture of me at the beach in Mazatlan, holding a margarita and wishing to no avail that the plane would forget to land. Alas for business trips with 5-hour layovers in resort towns!
Wednesday, October 11, 2006
It was going to happen eventually
Right, so, three days and six and a half balls later, I'm only on the third of five rows of ribbing on the body, with five rows each of ribbing on the sleeves to finish up as well. I...have a feeling I might be a little short...
Options are:
A) I've looked for another ball in the same dye lot and been unsuccessful. However, there are plenty of balls on eBay and elsewhere in at least the same colour. Should I finish off the body ribbing (I'm pretty sure there's enough for another row and a bind off), wait until I have another ball in hand, and do the sleeve ribbing in a slightly different dye lot? Since I did the project with two strands of yarn held together, a final ball in a different dye lot should be only barely noticeable.
B) I could undo the body ribbing so far, and go with a contrasting colour of Alpaca Silk. I've got the caramel, of course, but I also have a few balls in black. However, there aren't many really nice contrasts to teal, and I don't know that I'm all that keen on the idea anyway.
C) I could finish the body ribbing, bind off, and seam up the sleeves as they are. This is not a horrible option, really. This capelet is meant for inside wear when it gets colder and we start getting stingy with the heat (gas bill!).
Edited to add: Option D, where I could finish the body ribbing, and do the sleeve ribbing in the contrasting colour. I think this might be the ticket. I certainly don't want to rip the whole thing back and knit it in another colour, and I'd really like to get it done tonight.
Thursday, October 05, 2006
Desperate measures
Here we have some lovely yarn snatched from eBay at an excellent price:
And as if I could resist Debbie Bliss Alpaca Silk at 50% off:
Since I was spending money at elann anyway, I picked up yarn for my brother's Christmas scarf and cap set:
And who could resist bright red linen?
Sunday, October 01, 2006
I'm supposed to be studying
I've managed to turn the heel on the anklet sock without any major issues beyond having to rip it back twice due to attention issues. I abandoned the wrap and turn business and opted for something called a Dutch heel. It's looking okay so far, but I think I'll try longer needles the for my next sock project. These 5" Brittanys are too short!
And this is progress on the Kitty Pi bed to date:
That's two strands of Lett Lopi in spring green and two strands of Elann Peruvian Highland Wool in eggplant, I think. I've gone through two balls of the Lopi and am just finishing up two balls of the PHW. It'll probably require another two balls of each colour before it's big enough.
Friday, September 29, 2006
Seduced by free shipping
A neat new yarn from Patons, with the very unoriginal name Soy Wool Stripes. It's a 70% wool/30% soy blend, in a few variegated styles. I got 6 balls in Natural Geranium, and I'm thinking a little felted bag would be a good test project. Pretty!
I love the bright colours of the Cottontots. These will become baby knits, and possibly a dishcloth or two.
I know, I know, this is really doing nothing for the destash challenge. But it's all so pretty! And, um, now I'm set for Christmas knitting...yeah, that's it...
Wednesday, September 20, 2006
Secret Halloween project
Sunday, September 17, 2006
Poor, sad Henry
I want to finish him. I really do! But I so very much suck at sewing up the poor little bastard, and I keep messing up dumb things like where exactly on the bottom seam to attach his little legs, and the tattoo on his leg that I have tried nine hundred times to do, and still cannot get right. (Sorry, Pea, I've given up on that. It's bad enough that his facial expression is somewhere between angry and puzzled, when I was going for stern.) I'm half-tempted to mail him to the Borg (Pea's office tower) as is, and wait for the report of office workers horrified at the sight of a dismembered voodoo doll appearing in their midst.
